Building on the past to construct the future

This project included total replacement of bridge substructure and superstructure.  The replacement included removal of 3,500 tons of concrete, installation of 3-foot and 4-foot diameter drilled shafts, erection of 185 tons of structural steel and placement of over 1,500 cy of concrete.   Project was completed in May 2008. 

 
 
 
 
 
 
Illinois Constructors Corporation, Inc.
39W866 Fabyan Parkway, Elburn, IL 60119
T: 630.232.7280|F: 630.232.7281
©2017 Illinois Constructors
Home|About Us|Our Services|Projects/Case Studies
Estimating|Contact ICC|FAQs|News|Testimonials|Site Map
Web site design and development by Americaneagle.com